Carramar Tee Construction

A Massive 1600 square metre golf tee has been constructed by West Coast Turf at Carramar Golf Course. As well as the turf supply and installation, West Coast Turf undertook all necessary site works including spoil removal, sand delivery, final trim and levelling.

Neergabby Soft Leaf Buffalo Supplied and installed

Here West Coast Turf wheel barrowed in 5m3 of lawn sand to improve drainage and root growth. once we have carted the sand around the back it is then raked and screeded. Before a roll of lawn is installed a wetting agent and “turf Stater” fertiliser is applied which is the thoroughly watered in to ensure the new roots have plenty of food and moisture.